2024年12月10日
South entrance of domestic multi-storey car park opens, pedestrian flow between terminal and car park changed from 1/15 (Wed)
Due to construction work at the Fukuoka Airport Domestic Terminal Complex, the following changes will be made to the roads within the premises.
We apologize for any inconvenience caused during the construction period, and we appreciate your understanding and cooperation.
Until Tuesday, January 14, 2025

After Wednesday, January 15, 2025

① There will be changes to the traffic flow between the domestic parking lot and the domestic passenger terminal. ■
② The north exit of the domestic terminal building will connect to the road within the building and directly connect to the road heading towards Hakata.
・The south entrance of the domestic terminal building will be opened, meaning that the parking lot will be accessible from two entrances, the north and south.
③ Pedestrian flow between the domestic parking lot and the domestic passenger terminal will be changed.
After the change, some areas of the pedestrian flow will not have a roof. Umbrellas will be provided for use in the event of rain.
We apologize for any inconvenience caused during the construction period, and we appreciate your understanding and cooperation.